East AngliaThree

Norway

Client
SIEMENS ENERGY, Germany
Location
Stord, Norway
Execution time
August 2024. – ongoing

East Anglia Three is an offshore wind farm located in the North Sea. The offshore grid connection project East Anglia Three (EA3) comprises the HVDC OffshoreConverter Station, the HVDC Onshore Converter Station. The HVDC converter platform includes a jacket and a topside and is tobe fabricated in the Aker dockyard in Norway and then transported to its final location at the North Sea Outer Continental Shelf approximately 135 km east of Great Yarmouth, UK.

Scope of work - installation of:

  • 2 Power transformers 330/66/66 kV nominal power 628 MVA including oil treatment process and assisting on primary tests after installation
  • Control and Protection panels
  • Convertor Cooling water system - pump station with control panel
  • 66 kV GIS type 8DN8 - 22 feeders
  • 330 kV AC GIS type 8DQ1 -2 feeders
  • 320 kV DC GIS type 8DQ1DC - plus and minus pole
  • HVDC Convertor station – plus and minus pole

Selected projects

Active project
Sunrise Wind
Client
Siemens Energy, Germany
Location
Stord, Norway
Year
June 2023 – ongoing
Project details
Active project
HPP Jebba
Client
Andritz Hydro, Austria
Location
Jebba, Nigeria
Year
September 2021 – ongoing
Project details
Active project
HPP Nurek
Client
Andritz Hydro, Austria
Location
Nurek, Tajikistan
Year
March 2020 – ongoing
Project details