Rehabilitation and modernization of 2G6 and 2G5 generator units at Jebba hydro power plant on the Niger River.Rehabilitation consists of replacement of turbine, generator, power transformer, generator voltage equipment, control, protection and auxiliary power supply of the units as well as the excitation system.
Scope of work:
- Main electrical supervision on the rehabilitation of the EPS system