Near Dubai, Andritz Hydro is constructing pump storage HPP with total installed capacity of 250 MW (2x125 MW). Since the beginning of the installation phase our experts are involved in the project on the position of the Main EPS supervisor responsible for installation of electrical systems which covers cabling work for control and protection systems, auxiliary power supply, common system, installation of IPBD, LV busbars, power transformers, excitation system, electrical systems on the turbine and generator. Beside the main supervisor, we provided several supervisors and foremen who were leading local subcontractors and taking care about quality and time of execution. During the commissioning phase, our team was giving support to the commissioning engineers.